AXIS 2027
Call for abstracts

Present your work at AXIS 2027

Submit up to 300 words in one of eight tracks, from oil and gas, asset integrity and decommissioning to offshore wind, hydrogen, carbon storage and safety. Field case studies are reviewed on the same criteria as research.

Submissions open8 Nov 2026
Abstract deadline5 Feb 2027
Final decisions19 Feb 2027
Presenters register by19 Mar 2027
Conference20–22 Apr 2027
What to submit

Requirements

Plain text in four labelled paragraphs, so reviewers compare like with like. The sample abstract shows the format.

  • Up to 300 words, in English, following the four-part structure
  • A title of up to 20 words and up to five keywords
  • All authors and affiliations, with the presenting author marked
  • Your preferred track and presentation format
  • One figure or table, if it helps (optional)
  • Work not presented or published elsewhere, with clearance from your employer, partners or clients
No product promotion. Abstracts that advertise a company, product or service are scored down and may be declined. Name technologies generically and focus on data, results and lessons learned.
Industry case studies use their own four headings: the problem, the approach, the results or data, and the lessons learned. They are scored on the same criteria as research. Confidential figures can be normalised or anonymised, and no full paper is required.
One paid registration per accepted abstract. Each accepted abstract needs its own paid registration by 19 March 2027, 23:59 UK time. An invoice counts once it is paid. If you present two, register twice or ask a co-author to register for one. An abstract without one is withdrawn from the programme. One author may present up to two abstracts. For example, an academic presenting two abstracts at the early-bird rate pays £450 × 2 = £900. Early-bird fees start at £450 for academic staff and £250 for presenting students. See all fees
Tracks and topics

Eight tracks

Choose the closest fit. The organisers can move an abstract between tracks, and work at the edges of a track is welcome. Work from aerospace, maritime, civil and other sectors is welcome where the method transfers to energy.

01Subsurface, CO₂ Storage & Wells

Can caprock, faults and legacy wells hold CO₂ for decades?

  • 01.01CO₂ injectivity and caprock integrity in depleted fields
  • 01.02Legacy well integrity for CO₂ storage
  • 01.03Pressure build-up and fault reactivation
  • 01.04Dense-phase CO₂ transport and flow assurance
  • 01.05Geothermal from North Sea wells
  • 01.06Reservoir geomechanics and monitoring
  • 01.07Carbon capture, utilisation and storage (CCUS) systems
  • 01.08Petroleum, reservoir and subsurface engineering
  • 01.09Geothermal energy and subsurface heat storage
  • 01.10Drilling, well construction and well integrity
  • 01.11Subsurface characterisation, imaging and storage monitoring
  • 01.12Induced seismicity and subsurface risk
  • 01.13Multiphase flow and production engineering

4 Mt a year: the UK's first CO₂ storage permit, Endurance, first injection by 2027 NSTA, December 2024

02Floating Wind & Marine Renewables

Floating arrays scale only if moorings and dynamic cables last.

  • 02.01Mooring fatigue and shared anchors for floating arrays
  • 02.02Dynamic cable fatigue, monitoring and replacement
  • 02.03Snap loads and metocean extremes
  • 02.04Blade leading-edge erosion and offshore O&M
  • 02.05Wave and tidal survivability
  • 02.06Co-location with oil, gas and hydrogen
  • 02.07Offshore and onshore wind energy engineering
  • 02.08Offshore floating structures and ocean engineering
  • 02.09Marine hydrodynamics, stability and seakeeping
  • 02.10Mooring, anchor and foundation design
  • 02.11Wave, tidal and ocean energy technologies
  • 02.12Solar and hybrid offshore renewables
  • 02.13Marine operations, installation vessels and autonomous vessels

£216 vs £91 per MWh: floating against fixed-bottom wind in Allocation Round 7 ORE Catapult, January 2026

03Hydrogen, Storage & Conversion

Reused pipelines and offshore electrolysis meet the limits of materials.

  • 03.01Offshore electrolysis on live platforms
  • 03.02Hydrogen in reused North Sea pipelines
  • 03.03Ammonia and e-fuel conversion and storage
  • 03.04Underground and thermal storage
  • 03.05Battery ageing and safety
  • 03.06Fuel cells and catalysis
  • 03.07Hydrogen production, storage and transportation
  • 03.08Energy storage, batteries and fuel cells
  • 03.09Sustainable fuels, bioenergy and e-fuels
  • 03.10Hydrogen and electric propulsion for ships, aircraft and vehicles
  • 03.11Thermal engineering, heat transfer and energy efficiency
  • 03.12Nuclear energy and advanced reactor technologies

27 electrolytic hydrogen projects shortlisted in the UK's second allocation round GOV.UK, April 2025

04Materials, Fatigue & Structural Integrity

Fatigue, corrosion and hydrogen damage decide how long assets safely run.

  • 04.01Hydrogen embrittlement in steels and welds
  • 04.02Corrosion-fatigue of moorings and risers
  • 04.03Composite blades: erosion and repair
  • 04.04Micromechanics-informed fracture models
  • 04.05Structural health monitoring for life extension
  • 04.06Multiphysics and computational mechanics
  • 04.07Fatigue, fracture mechanics and damage tolerance
  • 04.08Corrosion, erosion and material degradation
  • 04.09Structural integrity assessment and remaining life
  • 04.10Welding, joining and interface mechanics
  • 04.11Vibration, dynamics and rotating machinery
  • 04.12Experimental mechanics and material characterisation
  • 04.13Advanced composites and lightweight materials
  • 04.14Metallic alloys, polymers, ceramics and smart materials
  • 04.15Nanomaterials and multifunctional materials
  • 04.16Materials for extreme and harsh environments
  • 04.17Tribology, wear and surface engineering
  • 04.18Non-destructive testing and inspection methods
  • 04.19Civil, geotechnical and foundation engineering for energy infrastructure
05Digital Twins, AI & Robotics

Uncrewed platforms need AI and physics engineers can trust.

  • 05.01Physics-informed ML for fatigue and remaining life
  • 05.02Digital twins for floating wind and platforms
  • 05.03Autonomous robotic inspection offshore
  • 05.04Sensing and data assurance for safety decisions
  • 05.05Cyber-physical security of uncrewed assets
  • 05.06Uncertainty, validation and verification
  • 05.07Digital twin technologies and applications
  • 05.08AI and machine learning in engineering
  • 05.09Robotics, automation and intelligent control
  • 05.10Autonomous systems, uncrewed vehicles and human-robot collaboration
  • 05.11Industrial IoT, smart sensors and embedded systems
  • 05.12Big data analytics and engineering informatics
  • 05.13Predictive maintenance and system health management
  • 05.14Simulation, optimisation and surrogate models
  • 05.15Computer vision for inspection
  • 05.16Virtual and augmented reality in engineering
  • 05.17Digital manufacturing and Industry 4.0
  • 05.18Trustworthy and explainable AI
06Energy Systems, Skills & Just Transition

Skills, supply chains and security while the North Sea changes.

  • 06.01Skills transfer from oil and gas to offshore energy
  • 06.02Supply chains for floating wind and CCS
  • 06.03Energy security, markets and regulation
  • 06.04Whole-life carbon and life-cycle assessment
  • 06.05Critical materials and circularity
  • 06.06Electrical power systems, smart grids and microgrids
  • 06.07Power electronics, electrification and electrical machines
  • 06.08Energy systems modelling, optimisation and integration
  • 06.09Renewable integration and system flexibility
  • 06.10Industrial decarbonisation
  • 06.11Energy economics, policy and investment
  • 06.12Engineering education and workforce development
  • 06.13Communities, public acceptance and a just transition
  • 06.14Sustainable transport systems and future mobility
  • 06.15Climate-resilient and interdependent energy infrastructure
  • 06.16Smart buildings and building energy performance

Over 90% of north-east Scotland's offshore skills are transferable Robert Gordon University, June 2026

07Decommissioning & Repurposing

Record spend, idle wells and assets that could live a second life.

  • 07.01Cutting the cost of well plugging and abandonment
  • 07.02Platform, pipeline and subsea removal
  • 07.03Reuse for CCS, hydrogen and wind
  • 07.04Recycling and materials recovery
  • 07.05Seabed recovery and legacy monitoring
  • 07.06Regulation and late-life operations
  • 07.07Asset lifecycle engineering and late-life decisions
  • 07.08Offshore oil and gas decommissioning
  • 07.09Offshore dismantling and heavy lifting
  • 07.10Wind turbine and renewable asset decommissioning
  • 07.11Nuclear facility decommissioning and waste management
  • 07.12Ship recycling and aircraft retirement
  • 07.13Circular economy and sustainable design
  • 07.14Remanufacturing and component reuse
  • 07.15End-of-life cost and environmental assessment

£2.6bn spent in 2025, a record; £43.4bn of UK decommissioning still to come NSTA, August 2026

08Safety, Reliability & Human Factors

How do we keep people safe while the energy system changes?

  • 08.01Process safety and major accident hazards offshore
  • 08.02Risk, reliability and maintainability of energy assets
  • 08.03Human factors and human reliability in operations
  • 08.04Safety culture, leadership and learning from incidents
  • 08.05Functional safety and safety-critical control
  • 08.06Safety of autonomous and AI-enabled systems
  • 08.07Engineering risk assessment and management
  • 08.08Quantitative risk assessment and probabilistic safety analysis
  • 08.09Occupational health, safety and environment
  • 08.10Accident investigation and incident modelling
  • 08.11Resilience engineering and emergency preparedness
  • 08.12Fire, explosion and hazard consequence modelling
  • 08.13Maintenance, inspection and reliability-centred maintenance
  • 08.14Climate and natural hazards at industrial facilities
  • 08.15Safety cases, regulation and assurance
  • 08.16Engineering ethics, governance and responsible innovation

167 lives lost on Piper Alpha in 1988 led to the offshore safety case regime Cullen Report, 1990

Across the tracks

Special sessions

Special sessions bring together work from different tracks and industries. Submit your abstract to the track that fits your contribution; the committee builds these sessions from accepted abstracts across tracks.

Special session

Cross-Industry Safety and Reliability

From aviation to energy

Aerospace · Nuclear · Offshore · Maritime

Special session

Digital Twins for Safety-Critical Systems

From predictive models to trustworthy decisions

AI · Robotics · Aviation · Energy

Special session

Engineering Asset Retirement and Circularity

From offshore decommissioning to aircraft recovery

Oil & Gas · Nuclear · Naval · Aerospace · Civil

Special session

Engineering the Next Energy Transition

Technology, people and society

Energy · Electrical · Chemical · Environment · Systems

Presentation formats

Six ways to present

State your preferred format when you submit. The programme committee may offer a poster instead of an oral slot to balance the sessions.

Research

Oral presentation

15 minutes plus 5 for questions. Slides go to the papers team by 13 April.

Research

Poster

A0 portrait, in the exhibition hall for all three days, with a poster session on Tuesday.

Industry

Industry case study

A reviewed field report, lessons learned or deployment story, in the industry sessions.

Postgraduate

PGR showcase

A 3-minute talk with one slide plus a poster, judged for the Best Student Award.

Image

Research Image Competition

A picture from your research, entered by email. The winner is the cover of the printed programme. How to enter

Remote

Remote, by exception

If a visa refusal, health, caring duties or travel disruption stops you travelling, you send a recorded talk and answer questions live. How it works

Review

How abstracts are assessed

At least two members of the scientific committee review each abstract, single-blind, scoring each criterion from 1 (weak) to 5 (excellent). The track's industry co-chair reads every abstract in the track. Review is rolling: most authors hear within about ten days, and all decisions are sent by 19 February 2027.

Novelty
What is new compared with the state of the art or current practice.
Rigour
Sound methods, data or field evidence behind the claims.
Relevance
A clear link to an energy engineering problem in one of the tracks.
Clarity
Problem, approach, result and value, stated plainly within the word limits.
After acceptance

From acceptance to publication

  1. 1

    Register

    The presenting author registers and pays. An invoice counts once it is paid.

    By 19 March 2027
  2. 2

    Send your slides

    Email your slides (PDF or PowerPoint) to papers@axisconference.org by 13 April 2027, 23:59 UK time, so the session chair has them in advance. Posters are printed and brought on the day.

    By 13 April 2027
  3. 3

    Present in Aberdeen

    Check in at your session room 15 minutes before it starts.

    On 20–22 Apr 2027
  4. 4

    Extended paper (optional)

    Submit a full paper for the proposed indexed proceedings or the journal special issue.

    By 1 June 2027

Every accepted abstract also appears in an open-access book of abstracts with its own DOI on Zenodo. The proceedings in IOP Conference Series and the special issue are proposed and subject to the publishers' approval. Publications has the current status.

Travel funding

Fund your trip

PhD students and early-career researchers can apply for travel funding from engineering societies. Start early: most awards need an accepted abstract or references.

Up to £750

IMechE conference grants

For members presenting a paper. Apply at least one month before the conference, by 12 March 2027. You need three references.

IMechE conference grants
Up to £600

IET travel awards

For national travel. You need one year's IET membership, and your trip must be at least a month after the funding round closes.

IET travel awards for national travel
Bursaries

SPE Aberdeen Section

Student bursaries for energy students at Scottish universities.

SPE Aberdeen Section

Your own university or doctoral training centre often has a conference fund too.

Need an invitation or acceptance letter for your funding application? Email hello@axisconference.org. For a visa, see visas and invitation letters.

Questions authors ask

Can I submit more than one abstract?

Yes. Each abstract is reviewed separately, and one person can present up to two. Each accepted abstract needs its own paid registration by 19 March 2027, 23:59 UK time. An invoice counts once it is paid. If you present two, register twice or ask a co-author to register for one. For example, an academic presenting two abstracts at the early-bird rate pays £450 × 2 = £900.

Will the deadline be extended?

Plan for 5 February. Any extension will be announced on this page and by email to account holders before the deadline passes.

Can a co-author present instead of me?

Yes. Change the presenting author in your portal before 19 March 2027, and make sure that person registers.

I need a visa. Can I get an invitation letter?

Yes. Invitation letters are issued from 12 January 2027, once an invoice has been raised for your registration. Submit by 29 January 2027, as review is rolling and you need time to apply. Register when registration opens on 12 January 2027, or as soon as you are accepted if that is later. Apply for the visa by 5 March 2027 at the latest. Visas and invitation letters explains the timing.

Can I withdraw after acceptance?

Yes, by withdrawing in your portal or emailing papers@axisconference.org. Refunds follow the terms.

The author guide has a checklist and presenter advice. Other questions: papers@axisconference.org. Not ready to submit? Become a reviewer, nominate a speaker or bring a problem to the Challenge Exchange.

Ask the organisers

Quick answers first, or message the AXIS 2027 team.

Not answered here?